|
 |
 |
Potential Energy
|
Case Studies
|
“There are loads of experts who have come here and told me that I need to install a hydro plant. You came here and told me the different ways that I could do it, and asked what I wanted!”
Potential Energy Case Studies:
Alhampton Mill Project - Alhampton, Somerset
Bindon Mill Project - Lulworth Estate, Dorset
Fiddleford Mill Project - Fiddleford, Dorset
Fonthill Lake Project - Fonthill, Wiltshire
Hewletts Mill Project - Galhampton, Somerset
Iford Manor Project - Iford, Wiltshire
 |
Case Study
|
Fiddleford Mill Project
|
|
|
 |
|

|
|
|
|
|
|
|

|
|
|
|
|
|
| Bring back power generation at this Grade 1 Listed Manor House. Provide return for a new company set up specifically to own and operate hydro schemes. |
|
|

|
|
|
|
|
|
|

|
|
|
|
|
|
|
 |
|
|
|
|
|
 |
 |
 |
 |
 |
 |
 |
|
 |
|
|
 |
|
 |
|
 |
|
|
 |
|
|
Click photographs for enlargements |
|
|
|
|

|
|
|
|
|
|
| Head 2.1m, Flow 4.0 m?/sec, Power 54 kW |
|
|

|
|
|
|
|
|
| The site is ideal for hydropower having a good drop over a weir on the river Stour, with a catchment of over 500 square kilometres. However, there were many challenges to be overcome, including site access. The site is frequented by many visitors and has a footpath running right through it. As a result, health and safety were a major concern. |
|
|
|
|
|
|
|